Pet Bag ManufacturerQUANZHOU JUNYUAN BAGS

Reply within one working day

Contact

Send a brief, a reference sample or a target price. We reply with a costed tech pack.

Send us quantities, target price and reference images. You will receive a costed tech pack and sampling quotation within 2 working days. Standard terms are MOQ 500 pieces per colourway, samples in 6-10 working days, bulk production in 35-50 days, AQL 2.5 inspection and T/T 30/70 FOB Xiamen.

Direct contacts

What to include in your enquiry

  1. Product family - custom design, material and colour, size and function, or a combination.
  2. Target dimensions and the weight band of the animal it must carry.
  3. Quantity per colourway and required delivery window.
  4. Destination market, so we can quote against the right compliance set.
  5. Packaging requirement - bulk packed, retail box, header card, or FBA prepped.
  6. Reference images or a physical sample if you already have one.

Commercial terms

ItemStandardNote
MOQ500 pieces per colourwaySizes may be mixed within one style
Sampling6-10 working daysAfter tech pack confirmation
Sample costQuoted per styleCredited against bulk orders above MOQ
Bulk production35-50 daysAfter sample approval
InspectionAQL 2.5Third-party inspection accepted
PaymentT/T 30/70Deposit before production, balance before shipment
ShipmentFOB XiamenDDP and EXW available on request
Quote turnaroundWithin 2 working daysWith full cost breakdown
Response hoursGMT+8, Mon-SatUsually replied within one business day

What happens after you write in

Day 1-2 - We acknowledge the enquiry and ask for any missing details. Day 2-3 - You receive a costed tech pack with named materials, hardware models and a breakdown showing which line items move the price. Day 3-13 - on receipt of the sampling fee, the prototype is built and shipped. After approval - production is booked for the agreed window, with inline checks and a pre-shipment inspection at AQL 2.5 before loading.

Copy-and-paste enquiry template

The fastest enquiry includes seven lines. Copy the block below into an email and fill it in:

Product: pet bag type / material specification / order quantity
Quantity: total pieces and split per colourway or size
Target dimensions: length x width x height, and animal weight to be carried
Destination market: EU / US / UK / other
Packaging: bulk polybag / printed box / header card / FBA prep
Target price: FOB per unit, or leave blank for our costing
Timeline: required delivery month

Documents that ship with every order

Each shipment travels with a commercial invoice and packing list, a country-of-origin declaration, the inspection report at the agreed AQL level, and the test reports for the specific dye lot used. Buyers selling into regulated markets also receive the applicable restricted-substance statement and, where required, children's product tracking label artwork. We keep one retained sample per style per production run for twelve months.

Sampling and revisions

First prototypes are built from the approved tech pack. Revisions focus on fit, structure, branding placement and labelling, and normally take 3-5 working days per round. Sample costs are credited against bulk orders above MOQ, and we keep one approved reference sample per style for production comparison.

Two worked timelines

Retailer seasonal programme. Enquiry in March, tech pack and costing by mid-March, two sampling rounds across April, approval in early May, bulk production through June and July, inspection and loading in August for a September shelf date.

Marketplace relaunch. Enquiry in month one, single sample round in month two using standard materials already in stock, approval immediately after, a 500-piece first run landing roughly 45-55 days after enquiry, followed by a reorder decision based on sell-through.

The twelve fields a wholesale enquiry needs before a price can be issued

A wholesale price is assembled from a list of decisions, and every missing decision becomes a question that delays the quotation. The twelve fields below are what our production team needs before it can return a number that survives to the invoice. Most enquiries arrive with six of them; the ones that arrive with twelve get a priced answer without a second round of clarification.

FieldWhy it moves the priceWhat we assume if blank
Style reference or spec sheetFixes pattern, marker and labourAn assumed construction
Quantity per colourwaySets the tier against 500Lowest assumed tier
Number of colourwaysSets dye lots and setup countSingle colourway
Colour standardPantone TCX or approved swatchShade cannot be committed
Size splitDrives marker efficiencyEven split
Shell fabric and denierLargest material cost600D polyester
Lining, mesh and paddingSecond material costStandard spec
Hardware gauge and finishStocked or bookedBlack stocked hardware
Baseboard and frameWeight band and board thickness5 mm board
Market and compliance scopeTest set and documentationEU and US baseline
Packaging and barcodeCarton spec and labourBulk pack
Term, port and target dateIncoterms 2020 and the slotIndicative, no slot held

Two fields are habitually skipped and both cost money. Compliance scope: a bag destined for the EU is assessed against REACH, for the US against CPSIA and Proposition 65, for Great Britain against UKCA, and for a childrens article against EN 71, and that test set is priced into the programme rather than added later. Packaging: a retail-ready carton with a GS1 barcode, a warning-labelled polybag and a hangtag is a different bill of materials from bulk pack, and a different carton volume, which changes freight.

Inspection access and AQL 2.5: how it runs, who attends, and what follows a fail

Pre-shipment inspection on every wholesale programme runs to AQL 2.5 under the ISO 2859-1 sampling plan, normally at general inspection level II with single sampling. A statistically defined number of cartons is drawn at random from the finished, packed shipment and the units inside are checked against the approved sample and the written specification. It is not a look at the top carton, and it is not a promise that every unit is perfect; it is an agreed risk threshold, and naming the standard means both sides read the same acceptance table.

Buyers may attend in person, and many do on the first run of a programme. Where travel is impractical, a third-party inspection body of the buyer choosing is booked into the same window: SGS, Bureau Veritas, Intertek and TUV all work to the same ISO 2859-1 tables, so the acceptance decision is comparable whoever holds the tape measure. Our production team books the slot, opens the cartons and provides the approved reference sample, the packing list and the retained test reports. Nothing about the inspection changes with who pays for it.

A fail is handled by defect class. Critical defects - a broken load-bearing stitch, a failed buckle, a baseboard that will not hold the rated band - stop the shipment, and the affected quantity is re-made and re-inspected. Major defects above the AQL 2.5 acceptance number trigger a full sort and rework at origin followed by a second inspection. Minor defects above the limit are sorted where the economics allow, or accepted with a written allowance and a price adjustment. The decision tree is agreed before production starts, not after the report lands.

One practical note saves a week. Call the inspection only when the shipment is packed and the carton count is final, and ask for the physical tests to be pulled on the same day: drop testing to ASTM D5276, rubbing to AATCC 8, shade to ISO 105. Those results are slow, and on a programme running 35 to 50 days of bulk production a week of test time is the difference between making and missing a vessel.

Send your brief today MOQ 500 pieces per colourway, samples in 6-10 working days, bulk production in 35-50 days under AQL 2.5 inspection.

Request a quote Ask for samples